Simplex Westpile have the expertise to support your project.

Two existing rail routes on the Stratford City site, namely the Woolwich and High Meads lines required complete enclosure to allow development for the Olympic Games Complex. Simplex carried out the piling works, much of which was within the existing rail cutting, during night possessions, constructing several hundred continuous flight auger piles of up to 900mm diameter. With piles heavily reinforced, the steel cages were prefabricated and incorporated into the piles by cranes sited at the top of the adjacent embankments.