Home /

News

/ /

Simplex Westpile piling for Premier Inn, Ealing

Simplex Westpile are currently undertaking piling for the new Premier Inn Hotel to be constructed neighbouring the prestigious Ealing Council Offices in Uxbridge Road, Ealing, West London.

Read More…

Newcastle’s Downing Plaza

Simplex Foundations are currently installing more than 300 bearing piles and a contiguous bored piled wall consisting of 190, 600mm and 750mm rotary auger piles founding into mudstone and siltstones for Phase 1 of the new £200m mixed use development by Downing, adjacent to the St James Park Stadium in Newcastle’s Gallowgate area.

Read More…

/

Ashmolean Museum, Oxford

Ashmolean Museum, Oxford

Westpile has completed its contract for the installation of a contiguous piled retaining wall and foundation piles for main contractor HBG Construction Limited, in the £50m redevelopment programme for the Ashmolean Museum, Oxford.

Read More…

/ /

Trinity Walk Shopping Centre, Wakefield

Simplex Foundations completed piling on the £210m Trinity Walk Shopping Centre Wakefield development for Main Contractor Shepherd Construction at the end of November following a three month £1.5m contract which included installation of approximately 300 linear metres, rotary bored contiguous piled retaining wall, and 500 tubular steel driven foundation piles.

Read More…

/

The Rose Bowl Building, Leeds

The Rose Bowl Building, Leeds

Westpile has commenced work on an £800,000 contract for the installation of a contiguous piled retaining wall and bearing piles in the first stages of groundworks for the new Rose Bowl Building being developed by Leeds Metropolitan University adjacent to its existing facilities at Portland Way, Leeds.

Read More…